Swope Middle School Phase 3

Phase 3 of the Swope Middle School Addition and Renovation Project will include demo of the existing gymnasium building and construction of a new +/- 39,200 square foot 2-story Classroom Building. Work within the existing school includes abatement/demo and construction of a renovated administration area, newly expanded multipurpose room, updated CLS classroom, teacher work room, and miscellaneous improvements throughout the existing classrooms beginning in the Summer 2021 through Summer 2022.
  Plan Set (click to expand/collapse)
United Construction appreciates your interest in this project. The following trades were required to prequalify in order to bid this public works project: Selective Demolition, Building Concrete, Masonry, Structural Steel, Casework, Membrane Roofing, Glazing, Flooring, Painting, Fire Protection Systems, Plumbing, HVAC, Electrical, Earthwork and Utilities, Landscaping and Irrigation. If your company did not prequalify with United Construction for the above trades, then your bid cannot be considered. All other trades are invited to provide a bid for the Swope Middle School Addition and Renovation Project - Phase 3. Subcontractors are required to have a current Nevada Contractor's License for scopes of work requiring installation.
Order this section, price will be calculated by SQFT
Download section as a Zip file free of charge
Order files below, price will be calculated by SQFT
Name Size
ODYSSEY ELECTRONIC DATA RELEASE CONDITIONS 178.0 KB
Swope MS GMP3 Bid Set Drawings - Volume 1 201.9 MB
Swope MS GMP3 Bid Set Drawings - Volume 2 90.0 MB