CCSD District Office Remodel & Expansion

In general, the work consists of furnishing all labor and materials for the portion of the existing building to be refreshed including complete demolition of the existing ceiling and HVAC for a new ceiling and HVAC system. Refreshed area includes new flooring and paint along with some incidental metal stud framing of new partition walls and furred walls. A new +/-900 SF stick framed addition and exterior site work including removal and replacement of asphalt and the removal of site concrete. To be installed is a new monument sign, concrete ramp and stairs and a new sidewalk, new walls, doorsnd mechanical, and electrical systems per plan. A backup generator is to be bid as an Additive Alternate
  Addendum #1 & #2 (click to expand/collapse)
Order this section, price will be calculated by SQFT
Download section as a Zip file free of charge
Order files below, price will be calculated by SQFT
Name Size
050721 - CCSD District Office Remodel & Expansion - Addendum 1.2 MB
CCSD District Office Remodel & Expansion - Addendum 2 293.3 KB
  Specifications/Docs (click to expand/collapse)
Order this section, price will be calculated by SQFT
Download section as a Zip file free of charge
Order files below, price will be calculated by SQFT
Name Size
Apprentice Agreement 155.6 KB
Apprentice Request Form 266.7 KB
Apprenticeship Utilization Guide 12 2019 424.3 KB
CCSD DO Project Manual - Specifications 4-12-21 2.7 MB
Exhibit D Insurance Requirements 142.6 KB
Invitation to Bid & Instruction to Bidders - DO Remodel & Expansion 10-21-20 kj DB 1.13.21 1.2 MB
Nevada_SPWB_Instructions_to_Bidders 45.1 KB
Project Workforce Checklist 341.3 KB
SB 207 Request for Waiver Form 201.9 KB
Subcontractor List 2019 294.5 KB